Metro Universal City Pedestrian Bridge, Universal City, CA
Metro Universal City Pedestrian Bridge, Universal City, CA

Owner

Metropolitan Transportation Authority (Metro)

Start Date

1/17/14

Completion Date

5/14/14

DYA Client

Miyamoto International, Inc.

Project Cost

$172,200 (DYA Fee)

Project Description

DYA provided geotechnical services for a new pedestrian bridge from the southeast corner to the northwest corner of Lankershim Boulevard and Universal Hollywood Drive.  The bridge will be located adjacent to the Metro Red Line Universal/Studio City Station entrance and will cross both Lankershim Boulevard and Universal Hollywood Drive.  Pedestrian circulation from the proposed Bridge will tie into the existing subway station through the existing METRO stairs, elevator, and escalator, located on the south side of the existing mezzanine level at the northwest corner of Lankershim Boulevard. and Campo De Cahuenga.

The preliminary plans provided by Metro showed the proposed bridge supported on shallow foundations.  However, based on existing geotechnical data near the site, the soft clays and liquefiable sands at the site are likely not suitable for shallow foundations.  DYA anticipated that the new structures will be supported on deep foundations consisting of cast-in-drilled-hole (CIDH) piles.  DYA evaluated the use of both deep and shallow foundations during design after a site specific field exploration hadbeen performed, using AASHTO and Metro design guidelines..

Because of the proximity of the bridge to existing structures, the proposed improvements may require excavations near existing utilities and building foundations.  Therefore, shoring or protection for the existing foundations will likely be required.  The project design also needed to consider the impact of the proposed foundations onto the existing adjacent structures.

Matthew R. Dennerline, PE – Geotechnical Manager

Christopher M. Diaz, PE, GE – Geotechnical Principal

Our Services

Design

  • Site and route evaluations
  • Geologic hazards
  • Seismic design
  • Site characterization
  • Subsurface drainage
  • Grading
  • Ground improvement
  • Slope stability
  • Foundations
  • Dynamic analyses
  • Pavements
  • Instrumentation

Construction

  • Material sources
  • Construction observation and testing
  • Verification of anticipated conditions
  • Evaluation of changed conditions
  • Foundation installation
  • Instrumentation
  • Claims evaluation

Environmental

  • EIR/EIS
  • Site characterization
  • Remediation
  • Solid and liquid waste disposal
  • Landfill
  • Aerially Deposited Lead (ADL) Studies
  • Phase I Initial Site Assessments (ISA)
  • Phase II Hazardous Waste Studies
  • Sustainability

Legal

  • Forensic investigation
  • Litigation support
Linkedin

Request for Qualifications